




"Kharrouba Copper represents one of the most compelling copper investment opportunities I have encountered. Following my site visit with President Frank Marzoli, I was highly impressed by the technical capability of the team, their disciplined approach to narrow-vein mining, and the quality of the operation overall. The mine is well-developed, equipped with modern, well-maintained infrastructure, and supported by a newly commissioned processing facility capable of handling current and future throughput. With current production levels of 700–800 tonnes per day and a clear pathway to exceeding 1,500 tonnes per day, Kharrouba demonstrates both operational strength and significant near-term growth potential. I have full confidence in the team's ability to deliver and believe this operation will create substantial value for investors."
— Mike Kernick,
Reference: Hancon Mining: https://hanconmining.com/